Pro-Line Racing Pro-2 2wd Short Course Truck Build-up

The C Hubs and steering knuckles are next. The kit includes a full complement of metal ball bearings.DSCF3058

DSCF3060

The front axles ride in the bearings.DSCF3061

It gets 2 shims.DSCF3063

before inserting the drive pinDSCF3064

on which the 12mm hex will get mounted.DSCF3066

Now we can mount the steering knuckle assembly to the front A arm with another captured hinge pin.DSCF3067

One done. The included wheel nuts have a rubber seal and are serrated which will help keep them from backing off.DSCF3069

The upper camber link finishes off the C Hub installation for this side.DSCF3070

DSCF3071

If you are building your truck to the stock setup, the steering links get built to 87.5mm from center to center of the eyelets. DSCF3072

Attach them to the steering knuckles.DSCF3073

Another instance of using a captured screw. Using the captured screws and hinge pins will certainly do wonders for durability on this truck. DSCF3074

DSCF3075

Pages: 1 2 3 4 5 6 7 8 9

Both comments and pings are currently closed.

One Response to “Pro-Line Racing Pro-2 2wd Short Course Truck Build-up”

  1. […] has plenty of great tips and photos on his thread..P-L Pro2 Build..I'll post more pictures after more setup is finalized Why are you gonna use a 10.5t motor? […]

Powered by WordPress